Sheffield · Mon–Sat 07:30–17:00
Home  /  Capabilities  /  Gas pipe replacement
01 — Core trade

Gas pipe replacement.

Cast-iron gas mains and services replaced for network operators — live works, traffic management, customer notifications, service transfers, pressure testing, purge & commission. The work we built the company around, and what we deliver every single day.

Since2012
PrioritySafety first
CoverageEast Midlands
01 — What we do

Live mains, no drama.

Most of our gas work is mains replacement on Cadent's iron-mains programme — replacing ageing cast-iron pipes with new PE.

We also run CCTV camera surveys. Records tell you where a pipe runs; a camera tells you what state it's in, whether the bore is clear before an insertion, and helps to locate services.

In scope

  • Cast-iron to PE main replacement (LP & MP)
  • Individual service transfers & reconnections
  • Live mains insertion
  • Pressure testing, purge & commission
  • CCTV camera survey of mains — condition, bore checks, verification
  • Customer notifications & appointment management
  • Traffic management — Chapter 8 / NRSWA
  • Full method statements & site-specific risk assessments

Built around the customer, not just the contract.

Every gas job we touch involves people whose heating, hot water and cooking depend on us getting it right. That's not marketing copy — it's the reason we run our notifications and reconnection process the way we do. Teams trained to talk to householders. Appointments kept. Sites cleaned before we leave.

Safety comes before production on this contract, and that isn't a slogan — it's why we treat the standards as a minimum rather than a target. Operatives are trained and accredited.

LP · MP · service laying · live insertion · pressure test · purge & commission.

02 — Standards

What we measure.

What we aim for on every street, and how our performance is judged.

Priority Safety first Production second. Where the two conflict on site, the work stops until it's safe.
Aim Right first time Get it right on the first visit — the dig, the connection and the surface — so nobody has to come back.
Customers Kept informed Householders told what is happening and when, appointments kept, and the street left tidy behind us.
Measured on Cadent’s scorecard Safety, compliance, environment, delivery, customer and streetworks — scored every month and reviewed with the client.
03 — Recent work

On site.

The trades that make up a mains replacement, from the dig to the camera survey.

New yellow PE main and service tees laid in a timber-shored trench
Cast-iron renewal · East Midlands · 2026
01 — Mains replacement

Cast iron to PE renewal

East Midlands · 2026

Ageing cast-iron main taken out of service and replaced with PE, service tees set in as the run goes down. Trench shored, main laid to depth, services transferred street by street.

Cast iron outPE inService transfer
Two operatives fitting a mechanical coupling to a medium-pressure main
MP connection · East Midlands · 2026
02 — Connections

MP pipe connections

East Midlands · 2026

Mechanical couplings and split tees fitted to medium-pressure main. Joints made up, torqued and leak-checked before the section is brought back into service.

MPCouplingsLeak check
Under-pressure drilling machine mounted on a live gas main
Under-pressure drilling · East Midlands · 2026
03 — Under pressure

Under-pressure drilling

East Midlands · 2026

Drilling machine mounted on the live main so a new connection can be made without shutting anybody off. The supply stays on while the tapping is cut and the coupon recovered.

Live mainTappingSupplies maintained
New gas valve and flange assembly installed in an open excavation
Valve installation · East Midlands · 2026
04 — Valves

Valve installation

East Midlands · 2026

Valves set into the run so sections of main can be isolated cleanly in future — for planned work or in an emergency. Flanges made up, valve set to level, chamber and cover to follow.

ValvesFlangedIsolation
Butt fusion machine welding two lengths of large-diameter yellow PE pipe
Butt welding · East Midlands · 2026
05 — Fusion

Butt welding

East Midlands · 2026

Lengths of PE welded end to end in the fusion machine. Pipe ends faced, heated and held under pressure to a set cycle, so the joint ends up as strong as the pipe either side of it.

PE fusionButt weldRecorded cycle
Digital pressure gauge on a test assembly fitted to a new PE main
Pressure testing · East Midlands · 2026
06 — Testing

Pressure testing

East Midlands · 2026

Every new section is put under test and held before anybody gets gas through it. Gauge on, pressure up, watched for the full duration — the reading is the evidence the joints are sound.

Strength testTightness testRecorded
Operative carrying out hot works on a steel gas main in an open excavation
Hot works · East Midlands · 2026
07 — Hot works

Hot works

East Midlands · 2026

Cutting and welding on steel main, carried out under a hot works permit with the atmosphere monitored and the excavation kept clear. Shaded and screened so the operative can see the weld.

PermitSteel mainGas monitoring
CCTV monitor showing the inside of a gas main during a camera survey
Camera survey · East Midlands · 2026
08 — Survey

Camera survey

East Midlands · 2026

Camera run through the main to see what the records can't tell you — the condition of the bore, what is left inside it, and whether it is clear for an insertion.

CCTVBore conditionPre-insertion
04 — Also from SAUK

The full offer.

Gas is the core, but the same teams close the loop on highway reinstatement, our Vac-Ex units are available for hire across the East Midlands, and our grab lorries keep the muck moving.

Have a gas scheme to price?

Send us the scope, we'll come back within one working day.

Drawings, programme, site address — whatever you have.

Request a quote +44 114 349 5201